
Middle Tennessee Construction
November 12 – November 18, 2009
DAVIDSON COUNTY, I-40 and Robertson Road Interchange: (Recovery Act Project)
Thursday November 12 through Wednesday November 18, 10AM and 1PM, each day, Rolling roadblocks for I-40 East bound and Westbound traffic for blasting operations on the north side of I-40 in the White Bridge Road area. Traffic will also be stopped on Robertson Rd., Urbandale Ave., and White Bridge Rd.
DAVIDSON COUNTY, Grading, drainage, and paving of the I-40 ramps @ 2nd & 4th Ave.:
Tuesday November 17, 8PM-6AM, The I-40 eastbound exit ramp to 2nd and 4th Ave. will be closed in order to mill the ramp.
Thursday November 19, 8PM-6AM, The I-40 eastbound exit ramp to 2nd and 4th Ave. will be closed in order to set barrier rail.
DAVIDSON COUNTY, I-440 Concrete Rehabilitation: (Recovery Act Project)
Saturday November 14, 4AM through Sunday November 15, 6AM, I-440 westbound will be closed from I-24 to I-65 for concrete repairs.
DAVIDSON COUNTY, Resurfacing on I-40 from US 70S to Charlotte Pike: (Recovery Act Project)
Thursday November 12 and Friday November 13, 8PM-5AM, There will be alternating lane closures on I-40 in both directions in order to place permanent striping on the roadway. One lane will remain open.
REGION 3 On-Call Guardrail:
Thursday November 12 through Wednesday November 18, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Maury, Rutherford, Williamson, Cheatham, Sumner, Dickson, Montgomery, Marshall, and Giles Counties for guardrail repair and installation.
Thursday November 12 through Wednesday November 18, 9AM-4PM, There will be various shoulder closures in Middle Tennessee on state routes for guardrail repair and installation.
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
Thursday November 12 through Wednesday November 18, 9AM-3PM and 7PM-6AM. There will be periodic day and night time shoulder closures at various locations within the areas listed below in order to install devices, perform electrical work, and pole installation.
Thursday November 12 through Wednesday November 18, 8PM-5AM, There will be periodic short term night time lane closures at the following locations to install device foundations, DMS foundation installation, and shoulder paving.
Saturday November 14 and Sunday November 15, 6AM-10AM, Right lane closure on I-40 EB between MM 219 and 220 (Percy Priest Dam) to install device poles due to lack of adequate shoulder.
REGION 3 Safety Improvements on Various State Routes:
Thursday November 12 through Thursday November 18, 8AM-5PM, (each day), There will be various rolling closures in Robertson, Davidson, and Sumner Counties on State Routes in order to retrace pavement marking.
REGION 3 Retracing of Painted Markings on Interstate and State Routes
Thursday November 12 through Thursday November 18, 8AM-5PM each day, There will be various rolling closures in Cheatham, Dickson, Montgomery, Robertson, Davidson, Bedford, Lincoln, and Williamson Counties on State Routes in order to retrace pavement marking.
WILLIAMSON COUNTY, Concord Rd. from Sunset Rd. to Edmondson Pike
Thursday November 12 through Wednesday November 18, 9AM-3PM, (excluding weekends), There will be alternating lane closures from Governor’s Way to Sunset Rd. in order to install storm drainage. Also, possible one lane closures from Edmondson Pike to Beech Grove Rd. for water line installation. Trucks will be entering and leaving the roadway. Flaggers will be utilized for these operations.
WILSON COUNTY, SR-171 (Mt Juliet Road) Widening: (Recovery Act Project)
Thursday November 12 through Wednesday November 18, 9AM–3PM, There will be temporary lane closures Mt. Juliet Road (SR-171) northbound and southbound, from Division Street to Lebanon Road, for the purpose of performing blasting work. The closures will be brief interruptions of about 5 to 15 minute periods.
DAVIDSON COUNTY, TDOT Maintenance:
Davidson County
Thursday November 12 through Wednesday November 18, 9AM-3PM, (excluding weekends), There will be possible lane closures at various locations in Davidson County in order to patch potholes on an as needed basis.
Thursday November 12 through Wednesday November 18, 9AM-3PM, (excluding weekends), There will be mobile operations in various locations in Davidson County for vegetation control. This will affect the shoulders or outside lanes.
Thursday November 12 through Wednesday November 18, 7PM-6AM, (excluding weekends), There will be alternating lane closures on I-24 eastbound and westbound from MM 40 to I-65 in order to mill and pave the roadway.
Sumner County
Thursday November 12, 7PM-5AM, The left lane of I-65 northbound in Sumner County at MM 97.0 will be closed for grinding and paving. One lane will remain open.
Montgomery County
Thursday November 12 through Wednesday November 18, 9AM-3PM, There will be intermittent lane closures on State Route 112 (U.S. 41 A) from the Pagent Lane to 11th Lane for the City of Clarksville to do sidewalk repair.
Thursday November 12 through Wednesday November 18, 9AM-3PM, There will be intermittent lane closures on State Route 12 from College Street to North Second Street for the City of Clarksville to install Christmas lights.
THOMAS & ASSOCIATES:
Thursday November 12 through Wednesday November 18, each day, 2PM, There will be rolling roadblocks on I-24 eastbound and westbound near Waldron Rd. (Exit 64) for blasting. Local police officers will be utilized for this operation.
DAVIDSON COUNTY, TDOT Utilities:
Monday November 16 through Friday November 20, 9AM-3PM, On SR-6, Franklin Road from Bradford Avenue for 3700' to Berry Road, Davidson County. This request, by N.E.S. is for replacement of poles, anchors and conductor. Various lane closures are expected throughout the day.
Monday November 16 through Friday November 20, 9AM-3PM, On SR-254, Old Hickory Blvd. from Stone Brook Drive to Franklin Pike, Davidson County. This request, from N.E.S., is for replacement of poles and anchors, transferring line. Various lane closures are expected throughout the day.
Thursday November 12, 7PM-6AM, On SR-11, Nolensville Road, at the intersection of Tanksley Avenue, Davidson County. This request, by Level 3, is for a directional bore for a 4" conduit.
City of Brentwood
Thursday November 12, Friday November 13, and Monday November 16, 9AM-3PM each day, There will be a lane closure in the right northbound lane of Franklin Road from Church Street to Town Center Way in order to install sidewalk.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather.
For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.
Important Information About Construction at Nashville International Airport
Terminal Roadway Project BNA Ramps up
The Terminal Access Roadway Improvements (TARI) Project is in full swing. TARI is designed to improve traffic conditions on Ring Road, the one-way road that surrounds Nashville International Airport’s short and long term parking facilities and offers access to the terminal. Phase 1 of TARI commenced in October 2008 and is expected to be completed in the fall of 2009.
Nashville International Airport would like to inform passengers and guests about the following updates regarding driving and parking at the airport:
Temporarily, no cell phone/waiting area is available.
If waiting for arriving passengers, you may use either the 10-minute waiting area outside the baggage claim area or the short-term parking garage.
The terminal entrance off of Donelson Pike, nearest I-40 and adjacent to the Economy Parking Lot, is temporarily closed due to construction. Drivers can still access the Economy Parking Lot from Donelson Pike.
NOTE: The main airport entrance off of Donelson Pike, adjacent to the Long-term Parking Lot, remains open.
Please watch for construction detour and speed limit signs, and stay alert for construction workers.
Digital TV
More on the conversion to digital television.
Talk of the Town
Nashville's top-rated talk show.
Contests
All contests & giveaways on NewsChannel5.com
Gas Gauge
Find the cheapest gas near your home.
News Team
Learn more about our on-air staff.
Private School Guide
Get info on local private schools